YOUR JOURNEY · CAD → CNC → INSTALL
The same pipeline, every time.
Your project moves through three phases with fixed payment milestones. Design happens in CAD, manufacturing on our CNC line in Moinabad, installation by our own crews - no site carpentry.
STEP 1
CAD design
Every module drawn to your walls
STEP 2
CNC cutting
Beam saw · ±0.1 mm tolerance
STEP 3
Edge & bore
PUR edge-banding, drill line
STEP 4
QC & pack
Flat-pack, labelled per module
STEP 5
Install
Furnio crews, handover & move-in
PHASE 01 · TYPICALLY 1 WEEK*
Initial discussion
Milestone: you pay ₹10,000
1.1
Get on a call with us
Tell us the scope - rooms, timeline, budget band.
1.2
Share your floor plan
A photo of the builder plan is enough to start.
1.3
Initial quote
BOQ-grade estimate from our rate engine in 48 hours.
1.4
Visit our experience centre
Touch the finishes, open the drawers, test the hardware.
1.5
Revised quote
Updated line-items after your finish selections.
1.6 · MILESTONE
Book with us
₹10,000 token locks your slot on the production calendar.
PHASE 02 · TYPICALLY 1 MONTH*
Design discussions
Milestone: you pay 50% advance
Site measurements, material selection and sorting out all the nitty-gritty.
2.1
Site measurement
Laser-measured walls; the CAD model starts from reality.
2.2
Design meeting 1 - layouts
Select the layout for each room.
2.3
Design meeting 2 - modules
Decide cabinets, drawers, internals, accessories.
2.4
Design meeting 3 - finishes
Lock shutters and counters from the 22-finish index.
2.5
Detailed 2D & 3D drawings
Every module dimensioned; nothing left to interpretation.
2.6 · MILESTONE
Final approval + 50% advance
Drawings signed off; your BOQ is locked and production is queued.
PHASE 03 · 45 DAYS*
Manufacturing & installation
45-day guarantee - or we pay your rent
Where the magic really happens and your dreams are brought home.
3.1
Manufacturing begins
Panels cut, edged and bored straight from the CAD file.
3.2
Ready for dispatch
QC-checked, flat-packed and labelled per module.
3.3 · MILESTONE
You pay the remaining 50%
Balance clears before the truck leaves the factory.
3.4
Installation
Furnio crews assemble on site - clean, fast, no carpentry dust.
3.5
Handover & move in
Walkthrough, warranty papers, done.
AFTER
Up to 15-year warranty
Material warranty with after-sales support for its full period.
*Representative of the time required and dependent on the rate of progress your designer and you mutually establish. Installation is dependent on site conditions.
Start phase 01 today.
A floor-plan photo and a phone call is all it takes.